Ductile cast iron Mechanical Tee pipe fitting with China Factory
Installation Instruction for Threaded&Grooved Mechanical Tee
1. Pipe Preparation
Clean the gasket sealing surface within 16mm of the hole and inspect the sealing surface visually for defects that may prevent proper sealing of the gasket. Don't drill the hole on weld line.
2. Remove burrs
Remove any burrs or slug before installation to protect the gasket and prevent leakage.
3. Gasket&Housing Installation
Insert the gasket into outlet housing and make sure the tab in the gasket line up with the tab recessing in the housing. Align outlet housing over the pipe hole making sure that the locating collar is in the pipe hole.
4. Alignment
Align the strap around the pipe, insert the bolts and tighten the nuts.
5. Tighten nuts
Alternatively and evenly tighten the nuts to the specified bolt torque.
6. Installation complete
There should be even gaps on two sides between the upper and lower housings.
Range of products
Rigid coupling, Flexible coupling, 90° Elbow, 45° Elbow, 22.5° Elbow, 11.25° Elbow, Tee, Reducing Tee(Grooved/Threaded), Cross, Reducing Cross(Grooved/Threaded), Mechnical Tee(Grooved/Threaded), Mechnical Cross(Grooved/Threaded), U-bolted Mechnical Tee, Reducer(Grooved/Threaded), Grooved Eccentric Reducer, Grooved Split Flange, Grooved Adaptor Flange, Cap.
Detailed information
Package : Cartons with pallet/ Wooden case
Delivery time : 25-40 Days
Size Sheet
About Us
The world's most advanced automatic disa molding line and sand processing ensure the quality of each product.
Tilting shot blasting machine
Test
In order to guarantee the quality, the company introduced German brand spectrograph, advanced KRX-TG, Metallographic image analyzer, gasket test equipment, green sand test equipment, cast iron assay analysis equipment, pressure inspection equipment etc. Thus a fast, accurate quantitative analyzing approach is provided for scale production
FAQ
Q: Are you trading company or manufacturer ?
A: We are a factory.
Q: How long is your delivery time?
A: Generally 15 days after the down payment. OEM 30 to 90 days.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance.
Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us.
Our advantages:
1: Globally acceptabe quality: The products offered by us are thoroughly examined by our experienced professionals to ensure their durability, reliability and long service life.
2:Competitive price: direct manufacturer, reducing all unnecessary cost for you.
3:Professional team:20 years foreign customers service experience. Over 10 years investment casting manufacture. Almost 35% high educated people.
4:Good service: Customer is first
Installation Instruction for Threaded&Grooved Mechanical Tee
1. Pipe Preparation
Clean the gasket sealing surface within 16mm of the hole and inspect the sealing surface visually for defects that may prevent proper sealing of the gasket. Don't drill the hole on weld line.
2. Remove burrs
Remove any burrs or slug before installation to protect the gasket and prevent leakage.
3. Gasket&Housing Installation
Insert the gasket into outlet housing and make sure the tab in the gasket line up with the tab recessing in the housing. Align outlet housing over the pipe hole making sure that the locating collar is in the pipe hole.
4. Alignment
Align the strap around the pipe, insert the bolts and tighten the nuts.
5. Tighten nuts
Alternatively and evenly tighten the nuts to the specified bolt torque.
6. Installation complete
There should be even gaps on two sides between the upper and lower housings.
Range of products
Rigid coupling, Flexible coupling, 90° Elbow, 45° Elbow, 22.5° Elbow, 11.25° Elbow, Tee, Reducing Tee(Grooved/Threaded), Cross, Reducing Cross(Grooved/Threaded), Mechnical Tee(Grooved/Threaded), Mechnical Cross(Grooved/Threaded), U-bolted Mechnical Tee, Reducer(Grooved/Threaded), Grooved Eccentric Reducer, Grooved Split Flange, Grooved Adaptor Flange, Cap.
Detailed information
Certificate : UL listed & FM approved
Standard grooved specifications : according to rigid coupling standard
Material : Ductile Iron conforming to ASTM A536, Grade 65--45--12
Thread : BSPT & BSP & NPT
Standard Coat : Epoxy-RAL3000
Optional : 1. painted 2.dacromat 3.galvanized
Color : Red, Blue, Orange, White
Gasket : EPDM / NBR / Silicon Rubber
Bolts and Nuts : ISO 898-1class 8.8
Payment term : T/T, LC at sightPackage : Cartons with pallet/ Wooden case
Delivery time : 25-40 Days
Size Sheet
About Us
The world's most advanced automatic disa molding line and sand processing ensure the quality of each product.
Tilting shot blasting machine
Test
In order to guarantee the quality, the company introduced German brand spectrograph, advanced KRX-TG, Metallographic image analyzer, gasket test equipment, green sand test equipment, cast iron assay analysis equipment, pressure inspection equipment etc. Thus a fast, accurate quantitative analyzing approach is provided for scale production
FAQ
Q: Are you trading company or manufacturer ?
A: We are a factory.
Q: How long is your delivery time?
A: Generally 15 days after the down payment. OEM 30 to 90 days.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance.
Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us.
Our advantages:
1: Globally acceptabe quality: The products offered by us are thoroughly examined by our experienced professionals to ensure their durability, reliability and long service life.
2:Competitive price: direct manufacturer, reducing all unnecessary cost for you.
3:Professional team:20 years foreign customers service experience. Over 10 years investment casting manufacture. Almost 35% high educated people.
4:Good service: Customer is first